Disaster recovery for banks: what a plan that works looks like
A recovery plan is only real once it has been rehearsed. Here is how banks can set targets, design a second site and prove it works.

Every bank has a recovery plan on paper. The harder question is what happens at 10 a.m. on a salary day when the primary site goes dark. Customers do not care which component failed. They care whether the mobile app, the ATM and the branch teller still work.
A plan that works begins with two numbers, a second site that is genuinely independent, and a habit of proving the whole thing on a schedule.
Start with two numbers
Recovery time objective (RTO) is how long a service can be down. Recovery point objective (RPO) is how much recent data you can afford to lose. Set them per service, because they drive almost every cost that follows.
| Service | Typical priority | What drives the target |
|---|---|---|
| Core banking and ledger | Highest | Customer balances must be exact |
| Mobile and internet banking | Highest | The channel customers notice first |
| ATM and card switching | High | Cash access and merchant payments |
| Reporting and analytics | Lower | Can usually wait for a rebuild |
If nobody can tell you the last date recovery was tested, you do not have a recovery plan. You have a document.
Make the second site truly independent
A recovery site in the same building, on the same power feed or behind the same carrier protects you from very little. Independence is what you are paying for.
- Separate location, far enough to avoid the same local incident
- Separate power and a different network carrier where possible
- Encrypted replication matched to your RPO
- Enough capacity to run critical services, not just store copies
- Keys and credentials that remain available if the first site is lost
Rehearse the failure
Recovery drills expose what diagrams hide: a certificate that exists only at the primary site, a firewall rule nobody documented, a batch job that assumes a hostname. Run drills on a schedule, record the actual recovery time, and fix what you find before the next one.
- Agree the scope and rollback steps with risk and operations
- Fail over a low-risk service first, then build toward core systems
- Measure actual recovery time and data loss against your targets
- Write down what broke and assign an owner to every fix
- Share dated results with auditors and the board
Quick answers
What is the difference between RTO and RPO?+
RTO is the maximum time a service can be unavailable. RPO is the maximum amount of recent data, measured in time, that can be lost. Each service should have its own targets.
How often should a bank test disaster recovery?+
On a regular schedule agreed with risk and compliance teams and any regulator, and after major system changes. Every test should produce dated, written results.